Why don’t we exclude steel in concrete calculation?

We have discussed concrete calculations in an earlier post. If you refer to the post, we don’t exclude the steel quantity. Why?

Based on the thumb rule of steel quantity or by the exact calculation, the amount of steel used in structural elements is from 1-3%. It is very low compared to the concrete volume.

Structural Element Percentage of Steel in Concrete
Slab 1%
Beam 1% to 2%
Column 2.50%

For example, take the below slab, which is 2m X 3m X 0.125m.

Therefore total concrete volume = 0.75 m3

According to the thumb rule, the required amount of steel for the slab is 1%

Therefore required steel quantity = 0.75 * 1% = 0.0075 m3 which is negligible.

This will be compromised in concrete wastage while pouring it. So we don’t exclude the reinforcement quantity separately.

Happy Learning 🙂

Bala

Bala is a Planning Engineer & he is the author and editor of Civil Planets.

Share
Published by
Bala

Recent Posts

Uses of Surveying

Before starting any civil engineering work, regardless of branches, horizontal, vertical, and angular measurements of…

2 years ago

Importance of Surveying

The data measurements gathered from surveying helps establish the plan and design of all civil…

2 years ago

What is Surveying?

Surveying is the art and science of civil engineering that determines the relative (comparable) position…

2 years ago

What is Grouting? – Types & Applications

The formation of cracks on the concrete surface may lead to reduce the durability of…

3 years ago

Difference Between Plinth Level, Sill Level, and Lintel Level

Understanding the different levels of structure seems a bit of a daunting task. Don’t worry…

4 years ago

What is Prestressed Concrete Pipe?

We knew that pipes are used to transport gas or liquid substance from one place…

4 years ago