We have heard this advice or instruction from superior “Ensure proper concrete curing” all the time.
Why?. Because using the right grade of concrete and making a proper mix ratio is just 50% of concrete work. The structure needs to be in a moist condition for at least 28 days to attain its ultimate strength.
The curing of concrete alone plays a vital role in concrete strength.
Curing is the process of developing concrete strength by moisturizing its surface. When curing, concrete absorbs the necessary water (moisture content) for its complete chemical action to reach its maximum strength.
The concrete will not attain the design strength immediately. The concrete will take 24 hours to reach its 16% of design strength, and the concrete achieves its full strength in 28 days.
Days | Strength Percentage |
Day 1 | 16% |
Day 3 | 40% |
Day 7 | 65% |
Day 14 | 90% |
Day 28 | 100% |
The curing period should continue depending upon the atmospheric conditions such as temperature, humidity, and wind velocity.
The curing period also depends upon the type of cement and the nature of the work.
We have to consider the below-mentioned factors before selecting any mode of curing.
Based on the type of construction work, the concrete will be cured by any of the following methods.
The water ponding curing method is a widely used method to cure the concrete.
This method is applied for flat surfaces. A small clay bund or water-retaining material is provided around the perimeter of the surface. The whole surface is divided into small portions by the bund and those enclosed areas filled with water.
The water ponding curing is generally used for pavements and floor slabs.
A best curing way for a vertical member of a structure is by covering it with wet Hessians and by frequent water spraying method.
The column and walls are cured by spraying water on the surface at regular intervals.
The concrete surface is applied with a coat of solvent or water-based sealing curing compound immediately after finishing.
The coat prevents the evaporation of water from the concrete and moist remains for long periods.
The chemical curing of concrete methods applied when water is scarce. In this method, water is added to the hygroscopic material and sprinkled over the surface.
The hygroscopic material absorbs moisture from the atmosphere and keeps the surface damp.
The membrane curing method is widely used in highway construction. The membrane curing of concrete methods is also used in water scarcity areas.
The membrane covering the surface retards the water evaporation from the structure and retains the moisture.
Curing done by water vapor known as steam curing. It is done under 2 conditions such as
Steam curing is done to gain rapid early strength on concrete. It will be applied on hardened concrete after 3 hours in a controlled manner. The precast concrete element is often cured by steam pressure.
Happy Learning 🙂
Before starting any civil engineering work, regardless of branches, horizontal, vertical, and angular measurements of…
The data measurements gathered from surveying helps establish the plan and design of all civil…
Surveying is the art and science of civil engineering that determines the relative (comparable) position…
The formation of cracks on the concrete surface may lead to reduce the durability of…
Understanding the different levels of structure seems a bit of a daunting task. Don’t worry…
We knew that pipes are used to transport gas or liquid substance from one place…
View Comments
i have requirement of plastering