Generally, 150mm thickness of sand filling is provided beneath the PCC bed.
You may be confused!.
The concrete is a stable element then why do we need sand filling beneath PCC in footing!.
There are five possible reasons behind sand filling under footings. Let’s see each other briefly.
Happy Learning 🙂
Before starting any civil engineering work, regardless of branches, horizontal, vertical, and angular measurements of…
The data measurements gathered from surveying helps establish the plan and design of all civil…
Surveying is the art and science of civil engineering that determines the relative (comparable) position…
The formation of cracks on the concrete surface may lead to reduce the durability of…
Understanding the different levels of structure seems a bit of a daunting task. Don’t worry…
We knew that pipes are used to transport gas or liquid substance from one place…